Time:2022-08-01 Views:776
It is not so easy to change some things after the light pole is erected. To install high-pole lighting products, of course, the foundation must be done first. If there is a problem, the cost of modification is too high, so it is better to follow the steps and wait for the foundation to be dry. Install the light pole again, otherwise there is no way to maintain it later. If the height is above 20 meters, it must be lifted. If there is no problem, everything will be fine. At least the height is above 15 meters. Now we all know that the profit of street lights is indeed too low. , the lamp panel is installed and the lamp pole is erected.
Let's talk about the correct steps. As a large-scale product in street lights, lifts, if the steps are reversed, it is not fun to change them later.
After all these are installed, install the light panel, install the hoist, and give you some advice, take the cable out of the ground part, electrical appliances and other lifting parts, and the cable needs to be worn inside the light pole.
The installation of high pole lamps must be careful.
No matter what, it won't be used for tank cranes.
The height of the hoist is limited. After the installation of all the lamps and lanterns, the power distribution box is turned on for trial operation, and the hot-dip galvanized steel wire rope is used.